
Epoxy Floor Coatings San Jose
Why Choose Epoxy for Your Concrete Floor?
Concrete is tough—but raw concrete stains, cracks, and creates dust. A professionally installed epoxy floor coating seals the slab with a non‑porous, chemical‑resistant layer that looks as good as it performs.
Heavenly Touch Stone Care has delivered more than 1,500 epoxy floor coatings in San Jose and across the South Bay for garages, warehouses, retail stores, and food‑service facilities.
Our interactive brochure shows color options and more.
Download it today!
Top Benefits at a Glance
Standard Epoxy
-
Full cure: 48 hrs.
-
UV resistance: Good
-
Scratch / impact: High
Epoxy + Polyaspartic Topcoat
-
Full cure: 24 hrs.
-
UV resistance: Excellent
-
Scratch / impact: Extreme
*No‑Peel Guarantee on every epoxy system we install.

Color & Finish Options
-
Full Flake Broadcast (HD Garage Series) – hides tire marks & dirt; unlimited color blends.
-
Quartz Sand (Commercial Grip) – extreme slip resistance for kitchens & pool decks.
-
Metallic Epoxy – marbled 3‑D depth that rivals stone at a fraction of the cost.
-
Solid Pigment – clean, high‑gloss showroom look in safety or corporate colors.
All systems include anti‑slip additive and UV‑stable topcoat.
Our 5‑Step Installation Process
1. Dust‑Free Diamond Grinding – opens concrete pores for maximum adhesion.
2. Crack & Pit Repair – we inject polyurea filler and re‑grind flush.
3. Moisture Testing – protects against future delamination.
4. Industrial Primer + Epoxy Basecoat – 100 % solids resin, three‑times stronger than DIY kits.
5. Polyaspartic Topcoat (Optional) – walk‑safe in 4 hrs, drive‑ready next day.
One‑Day Option? Yes—ask about our fast‑cure package for qualifying garages and commercial spaces.
San Jose, Morgan Hill, Gilroy, San Martin, Santa Cruz, Los Gatos, Monte Sereno, Saratoga, Cupertino, Sunnyvale, Santa Clara, Mt. View, Los Altos, Los Altos Hills, Palo Alto, Menlo Park, Atherton, Portola Valley, Woodside, Fremont, and Pleasanton



Epoxy vs. Other Flooring Choices
Epoxy Coating
-
Chemical resistance: ★★★★★
-
Maintenance: Sweep & damp mop
-
Install time: 1–2 days
Raw Concrete
-
Chemical resistance: ★☆☆☆☆
-
Maintenance: Dust & stains
-
Install time: N/A
Tile
-
Chemical resistance: ★★☆☆☆
-
Maintenance: Grout cleaning required
-
Install time: 3–5 days
Polished Concrete
-
Chemical resistance: ★★★☆☆
-
Maintenance: Dust mop
-
Install time: 3–4 days
Need a natural‑stone look? See our concrete polishing service.
Frequently Asked Questions
How long before I can park my car? 24 hours with our polyaspartic topcoat, 48 hours with standard epoxy.
Will hot tires peel the coating? Our surface-prep process plus a written no-peel warranty protect against hot-tire lift.
Is epoxy slippery when wet? We add slip‑resistant grit tailored to your use case.
How long does the epoxy smell last? Any odor from our low‑VOC resins dissipates within 24 hours once the coating hits its walk‑on cure stage and full ventilation is restored.
Can you coat outdoor concrete? Yes—UV‑stable polyaspartic works on patios & driveways.


Get Your Free, No‑Obligation Estimate
Call (408) 497‑4354 or request a quote online.
Want an option other than epoxy? Check out our concrete polishing page
Your floor isn’t restored until it’s had the Heavenly Touch.